TROPICAL GEOGRAPHY ›› 1995, Vol. 15 ›› Issue (4): 313-320.
Previous Articles Next Articles
Li Jingbao, Liu Xiaoqing, Pan Anmin
Received:
Online:
Published:
Abstract:
Through the analysis of hydrological data measured form 1951 to 1991,it is shown that water and sand entering the Dongting Lake form main rivers rivers along the southern bank of the Jingjiang count 300.2×109m3 and 191.84×106t per year on average,respectively.The lardest monthly amounts of water and sand entering the lake occur from April to July.The ratio of the runoffs in high and low water years is 1.88~2.78,while that of the sediment comes to 2.96~13.5.After cutting off a crook of the Jinsjiang,the amounts of water and sand entering the lake from the four entrances shows a high-Water and low-water periodic cycle,and the period is about ten years,in agreement with that data of Datong Station in the Yangtze River.Floed water occurs more possibly from July to August.Any combination of flood-peak encounter Can Cause severe flood disaster in the Dongting Lake area.In flood season,the amount of water and sand entering the lake ig so large that 155.1×106t of sediment accumulate on the lake bed each year,shrinking the area of water surface,and capacity and depth of the lake.
Key words: The Jingjiang River, The Dongting Lake, Runoff amount Sediment discharge
Li Jingbao, Liu Xiaoqing, Pan Anmin. WATER AND SAND ENJERING THE DONNTING LAKE FROM THE MAIN RIVERS ALONG THE SOUTHERN BANK OF THE JINGJIANG AND THEIR IMPACT ON THE LAKE[J].TROPICAL GEOGRAPHY, 1995, 15(4): 313-320.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.rddl.com.cn/EN/
http://www.rddl.com.cn/EN/Y1995/V15/I4/313
[1] 李景保,刘晓清.荆江裁弯与葛洲坝兴建对祠庭湖的影响.湖南师大学报(自科版).1993(4).[2] 史运良等.长江中下游干流的逆时针水沙关系分析.地理学报.1986(2).[3] 刘晓清.洞庭湖-大洪涝年的特征分析.南京大学学报(自然灾害研究专辑).1991.[4] 林承坤.洞庭湖水沙特性与湖泊沉积.地理科学.1987(1).[5] 李景保.近数十年洞庭湖湖盆形态与水情的变化.海洋与湖沼学报.1992(6).